Floor Heights: Height of each floor will be 10’ from finished floor level to finished floor level.
Steel: Kamadhenu,SUNVIK, A-ONE or equivalent, priced at Rs. 65,000 per ton.
Cement: RAMCO, ZUARI, DALMIA or Equivalent, with a basic price of Rs. 380 per bag.
RCC Framed Structure: Constructed with M-20/M-25 grade concrete using 20mm and 40mm aggregates.
Foundation: Assumed to be isolated footings in regular soil with a bearing capacity of 180kN/m² and above, up to a depth of 5 feet. Additional charges will apply for specialized foundation designs or additional excavation depth beyond 5 feet.
Plastering: Internal plastering (1:5 cement mortar), external plastering (1:5 cement mortar), and ceiling plastering (1:4 cement mortar) will be done. Internal plaster thickness will be 15mm, and external plaster will be 12mm + 8mm, applied in two coats.
Chicken Mesh: Used at beam, column, and masonry wall junctions, and at electrical conduit chases.
Plinth Level: Set at 1 foot 6 inches above the existing ground level.
Blockwork Masonry: Standard solid concrete blocks with plaster, 4″ for internal partitions and 6″ for external walls, using mechanically pressed blocks (APCO or equivalent brands).
Double washed M-sand for masonry and P-sand for plastering.
Lintels: Provided only over openings with a bearing of 6″ into the edge of the openings.
UG Sump: Constructed with 6″ concrete blocks, waterproof plastered, with a capacity of 8,000 liters.
The entry ramp is included based on the site conditions.
Doors & Windows- Percentage of Opening for Windows & Balcony Doors: Maximum 12% of built-up area
Main Door: Teak wood frame and shutter including hardware -Rs. 25,000 per door. Frame thickness of 6 inches by 4 inches, shutter thickness of 38mm.
Puja Door: Teak wood frame and wood shutter including hardware – Rs. 15,000 per door (if applicable).
Internal Door: Sal wood frame and flush shutter including hardware – Rs. 7,000 per door. Frame thickness of 5 inches by 3 inches, shutter thickness of 32mm.
Bathroom Door: Frame and shutter including hardware – Rs. 5,000 per door. Frame thickness of 4 inches by 2 inches, shutter thickness of 32mm.
UPVC Windows: 5mm clear glass with MS grills. Basic price: Rs. 550 per sqft for UPVC with MS grill.
The floor plan and elevation must be finalized within 30 days from the date of releasing the first floor plan proposal by the architect.
SSM below the plinth is not included; if required, it will be charged based on actual costs.
Anti-termite treatment will adhere to standard procedures.
Sewer line connection to the main drain line is included up to 10 feet from the building.
The client must provide water and electricity for the work.- Rates are based on natural earth excavation. Additional charges will apply for concrete structures, stones, rock slush, or any other obstacles encountered during excavation.
The cost assumes that the site and road are at the same level.
This package does not include equipment, machinery, or fixtures such as sump pumps, solar panels, tanks, geysers, or bulbs.
The client will bear the approval costs for power and water.- Road cutting charges for connecting electricity and sewage lines are not included and will be charged additionally.
Costs for purchasing new earth or removing existing earth for excavation/backfilling purposes will be charged based on actual costs.
The number of toilets is limited to 2, and kitchen/utility rooms are limited to 1 per 1,000 sqft respectively.
Liaison assistance with BBMP/BDA/BMRDA and similar authorities will be provided by the company, with fees to be borne by the client.
Floor Heights: Height of each floor will be 10’6” from finished floor level to finished floor level.
Steel: Kamadhenu or equivalent, priced at Rs. 70,000/- per ton.
Cement: Birla or Equivalent, with a basic price of Rs. 400/- per bag.
RCC Framed Structure: Constructed with M-20/M-25 grade concrete using 20mm and 40mm aggregates.
Foundation: Assumed to be isolated footings in regular soil with a bearing capacity of 180kN/m² and above, up to a depth of 5 feet. Additional charges will apply for specialized foundation designs or additional excavation depth beyond 5 feet.
Plastering: Internal plastering (1:5 cement mortar), external plastering (1:5 cement mortar), and ceiling plastering (1:4 cement mortar) will be done. Internal plaster thickness will be 15mm, and external plaster will be 12mm + 8mm, applied in two coats.
Chicken Mesh: Used at beam, column, and masonry wall junctions, and at electrical conduit chases.
Plinth Level: Set at 1 foot 6 inches above the existing ground level.
Blockwork Masonry: Standard solid concrete blocks with plaster, 4″ for internal partitions and 6″ for external walls, using mechanically pressed blocks.
Double washed M-sand for masonry and P-sand for plastering.
Lintels: Provided only over openings with a bearing of 6″ into the edge of the openings.
UG Sump: Constructed with 6″ concrete blocks, waterproof plastered, with a capacity of 10,000 liters.
The entry ramp is included based on the site conditions.
Balconies & Windows- Percentage of Opening for Windows & Balcony Doors: Maximum 18% of built-up area
Main Door: Teak wood frame and shutter including hardware -Rs. 40,000 per door. Frame thickness of 6 inches by 4 inches, shutter thickness of 38mm.
Puja Door: Teak wood frame and wood shutter including hardware – Rs. 20,000 per door (if applicable).
Internal Door: Sal wood frame and flush shutter including hardware – Rs. 10,000 per door. Frame thickness of 5 inches by 3 inches, shutter thickness of 32mm.
Bathroom Door: Frame and shutter including hardware – Rs. 8,000 per door. Frame thickness of 4 inches by 2 inches, shutter thickness of 32mm.
UPVC Windows: 5mm clear glass with MS grills. Basic price: Rs. 650 per sqft for UPVC with MS grill.
The floor plan and elevation must be finalized within 30 days from the date of releasing the first-floor plan proposal by the architect.
SSM below the plinth is not included; if required, it will be charged based on actual costs.
Anti-termite treatment will adhere to standard procedures.
Sewer line connection to the main drain line is included up to 10 feet from the building.
The client must provide water and electricity for the work. – Rates are based on natural earth excavation. Additional charges will apply for concrete structures, stones, rock slush, or any other obstacles encountered during excavation.
The cost assumes that the site and road are at the same level.
This package does not include equipment, machinery, or fixtures such as sump pumps, solar panels, tanks, geysers, or bulbs.
The client will bear the approval costs for power and water.- Road cutting charges for connecting electricity and sewage lines are not included and will be charged additionally.
Costs for purchasing new earth or removing existing earth for excavation/backfilling purposes will be charged based on actual costs.
The number of toilets is limited to 2, and kitchen/utility rooms are limited to 1 per 1,000 sqft respectively.
Liaison assistance with BBMP/BDA/BMRDA and similar authorities will be provided by the company, with fees to be borne by the client.
Floor Heights: Main living area floors will have a height of 11’6″, and other areas will have a height of 10’6″ from finished floor level to finished floor level.
Steel: JSW or equivalent, priced at Rs. 75,000 per ton.
Cement: Ultratech or Birla Super, with a basic price of Rs. 425 per bag.
RCC Framed Structure: Constructed with M-20/M-25 grade concrete using 20mm and 40mm aggregates.
Foundation: Assumed to be isolated footings in regular soil with a bearing capacity of 180kN/m² and above, up to a depth of 5 feet. Additional charges will apply for specialized foundation designs or additional excavation depth beyond 5 feet.
Plastering: Internal plastering (1:5 cement mortar), external plastering (1:5 cement mortar), and ceiling plastering (1:4 cement mortar) will be done. Internal plaster thickness will be 15mm, and external plaster will be 12mm + 8mm, applied in two coats.
Chicken Mesh: Used at beam, column, and masonry wall junctions, and at electrical conduit chases.
Plinth Level: Set at 1 foot 6 inches above the existing ground level.
Blockwork Masonry: Standard solid concrete blocks with plaster, 4″ for internal partitions and 6″ for external walls, using mechanically pressed blocks (APCO or equivalent brands).
Double washed M-sand for masonry and P-sand for plastering.
Lintels: Provided only over openings with a bearing of 6″ into the edge of the openings.
UG Sump: Constructed with 6″ concrete blocks, waterproof plastered, with a capacity of 12,000 liters.
The entry ramp is included based on the site conditions.
Doors & Windows- Percentage of Opening for Windows & Balcony Doors: Maximum 22% of built-up area
Main Door: Teak wood frame and shutter including hardware -Rs. 60,000 per door. Frame thickness of 6 inches by 4 inches, shutter thickness of 38mm.
Puja Door: Teak wood frame and wood shutter including hardware – Rs. 30,000 per door (if applicable).
Internal Door: Sal wood frame and flush shutter including hardware – Rs. 13,000 per door. Frame thickness of 5 inches by 3 inches, shutter thickness of 32mm.
Bathroom Door: Frame and shutter including hardware – Rs. 10,500 per door. Frame thickness of 4 inches by 2 inches, shutter thickness of 32mm.
UPVC Windows: 5mm clear glass with MS grills. Basic price: Rs. 800 per sqft for UPVC with MS grill.
The floor plan and elevation must be finalized within 30 days from the date of releasing the first-floor plan proposal by the architect.
SSM below the plinth is not included; if required, it will be charged based on actual costs.
Anti-termite treatment will adhere to standard procedures.
Sewer line connection to the main drain line is included up to 10 feet from the building.
The client must provide water and electricity for the work.- Rates are based on natural earth excavation. Additional charges will apply for concrete structures, stones, rock slush, or any other obstacles encountered during excavation.
The cost assumes that the site and road are at the same level.
This package does not include equipment, machinery, or fixtures such as sump pumps, solar panels, tanks, geysers, or bulbs.
The client will bear the approval costs for power and water.- Road cutting charges for connecting electricity and sewage lines are not included and will be charged additionally.
Costs for purchasing new earth or removing existing earth for excavation/backfilling purposes will be charged based on actual costs.
The number of toilets is limited to 2, and kitchen/utility rooms are limited to 1 per 1,000 sqft respectively.
Liaison assistance with BBMP/BDA/BMRDA and similar authorities will be provided by the company, with fees to be borne by the client.